Analysis and discuss on the force applied on protecting pipe for well casing under high pressure
Abstract
The damage of casing is caused by higher water injection pressure one year after another.The research works on the purpose of protecting casing for water injection well have been carried out.The protecting pipe consists of hydraulic anchoring,Y341 packer,large diameter injector and ball seat.The bottom section of the pipe can be connected to the injection tube in separated zone.The upper part of casing is protected effectively and casing service life is elongated.This paper has given detailed calculation of forces before anchoring,sealing,injection and deformation.its result can be the guidance for onsite operation and tool design.
BibTeX
@inproceedings{bian2004analysis,
author = {Jiang Bian},
title = {{Analysis and discuss on the force applied on protecting pipe for well casing under high pressure}},
booktitle = {Oil},
year = {2004},
}Ask Althea to put this paper to the test.
Loading related content...