Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

Erik Ela, M. Milligan, Brendan Kirby, Aidan Tuohy, David Brooks2012 · DOI

TL;DR

As the power grid transitions toward inverter-based renewables, the "natural" frequency response historically provided by heavy spinning turbines is declining. This paper identifies a critical flaw in current electricity markets: they often lack incentives—or even financially penalize—generators that autonomously step in to stabilize the grid during a frequency crisis. The authors propose four market-based frameworks to turn this essential reliability service into a compensated ancillary product.

What Problem Does This Paper Address?

Maintaining a steady electrical frequency (60 Hz in the U.S.) is a balancing act. When a large power plant suddenly trips offline, the frequency drops instantly. If it falls too far, it triggers automatic blackouts to prevent equipment damage.

Historically, conventional power plants (coal, gas, hydro) provided "Frequency Responsive Reserve" (FRR) or "primary response" through mechanical governors that automatically increased power output when they sensed a frequency drop. Because this was an inherent feature of the technology, most markets never bothered to pay for it.

However, frequency response in the U.S. has been declining for 20 years. Modern plants often operate in modes that "block" this response, and many wind and solar installations are not yet configured to provide it. Worse, in many current market designs, if a generator's governor kicks in to save the grid, the resulting deviation from its scheduled output can trigger a financial penalty for "non-performance." The paper seeks to fix this "disincentive" and ensure the grid remains stable as the generation mix evolves.

Methods

The paper provides a qualitative and economic analysis of power system operations and market structures. The authors outline the physics of frequency control—distinguishing between inertial response, primary response (FRR), and secondary response (Regulation)—and then evaluate four specific policy/market proposals:

  1. Elimination of Penalties: Simply stopping the practice of fining generators for output deviations during frequency events.
  2. Specific Accountability: Adjusting settlement logic so the market "expects" a generator to deviate based on its governor settings, only penalizing it if it fails to provide the expected help.
  3. Joint Requirements: Folding FRR requirements into the existing "Spinning Reserve" market.
  4. A Dedicated FRR Market: Creating a separate, co-optimized ancillary service market where resources bid their frequency-response capability (MW/0.1Hz).

Datasets

As a technical policy report, this paper does not use a specific training dataset or a new computational benchmark. Instead, it relies on:

  • Historical Reliability Standards: References to NERC (North American Electric Reliability Corporation) and UCTE (European) standards for frequency bias and disturbance control.
  • Market Rules: Analysis of existing ISO (Independent System Operator) tariffs, specifically citing the New York ISO (NYISO) and ERCOT (Texas) as case studies.

Key Insights and Ideas

  • The Tolerance Band Paradox: One of the most striking insights is that a generator with a standard 5% droop governor will automatically deviate by more than 3% of its capacity if the frequency drops by 90 mHz. Since some ISOs have a 3% tolerance band for penalties, a generator is effectively fined for doing exactly what the grid needs it to do.
  • Renewables are Part of the Solution: The authors highlight that while wind and solar have contributed to declining inertia, they are technically capable of providing extremely fast frequency response via power electronics—they just lack the financial incentive to do so.
  • Market Complexity vs. Efficiency: There is a direct trade-off between simple fixes (removing penalties) and efficient ones (a dedicated market). While a dedicated market is the most complex to implement, it is the only way to ensure the "least-cost" solution for grid reliability.

Key Results

The authors summarize their findings in a comparative analysis of the four proposals:

  • Proposal 1 (Penalty Removal): Low complexity but provides no proactive incentive for new resources to offer the service.
  • Proposal 2 (Accountability): Medium complexity; ensures "good actors" aren't punished but still doesn't create a revenue stream for the service.
  • Proposal 3 (Merged Market): Medium complexity; provides revenue but may "muddy" price signals by combining two different physical services.
  • Proposal 4 (Separate Market): High complexity but high efficiency. It provides clear price signals and allows diverse technologies (including demand response and batteries) to compete.

The authors conclude that the most efficient outcome likely involves a combination of Proposal 4 (the market) and Proposal 1 or 2 (fixing the settlement logic).

Limitations and Future Work

  • Regulatory Hurdles: The authors acknowledge that creating a new market (Proposal 4) requires massive software overhauls and significant federal/stakeholder approval, which can take years.
  • Interconnection Coordination: Frequency is an "interconnection-wide" issue. If one region creates a market and another doesn't, it creates "free-rider" problems where one area pays for the stability of the entire Eastern Interconnection.
  • Standardization: At the time of writing, a unified North American frequency response standard was still under development. The authors note that market designs must be compatible with these evolving physical requirements.

Summary updated

Abstract

Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. Frequency responsive reserve arrests the frequency decline resulting in the stabilization of system frequency, and avoids the triggering of under-frequency load-shedding or the reaching of unstablefrequencies that could ultimately lead to system blackouts. It is a crucial service required to maintain a reliable and secure power system. Regions with restructured electricity markets have historically had a lack of incentives for frequency responsive reserve because generators inherently provided the response and on large interconnected systems, more than sufficient response has beenavailable. This may not be the case in future systems due to new technologies and declining response. This paper discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.
BibTeX
@misc{ela2012alternative,
  author = {Erik Ela and M. Milligan and Brendan Kirby and Aidan Tuohy and David Brooks and A. Tuohy and D. Brooks},
  title = {{Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service}},
  year = {2012},
  doi = {10.2172/1037501},
}
Figure