NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Advancing Sustainable Road Construction with Multiple Regression Analysis, Regression Tree Models, and Case-Based Reasoning for Environmental Load and Cost Estimation

Joonsoo KimBuildings 2025

TL;DR

This paper tackles the critical challenge of accurately predicting environmental impact and construction costs for road projects, especially during the early planning and design phases where data is often scarce. By comparing three machine learning approaches (Multiple Regression Analysis, Regression Trees, and Case-Based Reasoning) on a dataset of 100 Korean road projects, the study identifies the most effective models for each stage, offering a path towards more sustainable and cost-effective infrastructure development.

What Problem Does This Paper Address?

The construction industry, particularly road construction, is a major contributor to environmental degradation and requires substantial financial investment. Accurately estimating both the environmental load (e.g., greenhouse gas emissions, resource depletion) and construction costs early in the project lifecycle is crucial for making informed decisions that balance sustainability with economic feasibility. However, existing methods often struggle due to limited data, complex project variables, and a lack of integrated approaches that consider both environmental and economic factors simultaneously. This paper aims to bridge this gap by applying and comparing machine learning techniques to provide more reliable predictions at the planning and design stages.

Methods

The study employs three distinct machine learning techniques:

  • Multiple Regression Analysis (MRA): A standard statistical method used to model the relationship between a dependent variable (environmental load or cost) and one or more independent variables. The researchers utilized best subset regression to identify the optimal combination of variables for their models.
  • Regression Trees (RT): A tree-like model that recursively partitions data based on feature values to predict an outcome. This method is known for its interpretability, offering a flowchart-like decision process.
  • Case-Based Reasoning (CBR): An instance-based learning approach where new problems are solved by retrieving and adapting solutions from similar past cases. This method relies on a database of historical projects.

A novel aspect of this research is the direct comparison of these methods under conditions of limited data, aiming to understand their performance trade-offs in a real-world, data-scarce environment.

Datasets

The study utilized a dataset of 100 national road construction cases from the Republic of Korea, collected between 2016 and 2021. This dataset was divided into two stages:

  • Planning Stage Database: Included variables such as administrative district, road height, grade, topography, design speed, road length, road area, pavement thickness, number of lanes, and road width.
  • Design Stage Database: Encompassed detailed construction activities and associated materials, including earthworks (excavation, paving), drainage, underground tunnels, and material quantities.

This dataset represents a newly compiled benchmark for road construction projects in Korea, specifically curated for environmental and cost estimation.

Key Insights and Ideas

  • Stage-Specific Model Performance: The "best" machine learning model is not universal; its effectiveness depends heavily on the project stage. CBR excels in the early planning phase, while MRA proves superior in the more complex design phase.
  • Data Scarcity is a Major Hurdle: The study highlights that even with 100 cases, data limitations significantly impact model accuracy. The need for larger, more diverse datasets is paramount for future improvements.
  • Interpretability vs. Accuracy Trade-off: Regression Trees offer a more interpretable, flowchart-like output, but generally exhibit higher error rates compared to MRA, especially as project complexity increases.
  • CBR's Sensitivity to Complexity: While CBR performs well with limited variables in the planning stage, its accuracy degrades significantly in the design stage, suggesting it struggles to adapt to the increased number of interacting variables and nuanced decisions.
  • Importance of Variable Selection: The study emphasizes that identifying and selecting the most influential variables (e.g., road height, design speed) is critical for improving model accuracy, even with limited data.

Key Results

  • Planning Stage:
    • Environmental Load: CBR achieved the lowest average error rate (15.9%), followed by MRA (37.0%) and RT (36.7%).
  • Construction Costs: CBR also outperformed with the lowest average error rate (19.9%), followed by MRA (23%) and RT (28.3%).
  • Design Stage:
    • Environmental Load: MRA was the most accurate with an error rate of 12%, significantly outperforming RT (28%) and CBR (45.2%).
  • Construction Costs: MRA again showed the best performance with an error rate of 23%, followed by RT (23%) and CBR (33%).

Limitations and Future Work

  • Limited Dataset Size: The study used only 100 road construction cases, which is a significant limitation. The authors suggest that larger and more diverse datasets are crucial for enhancing model accuracy and generalizability.
  • Absence of Qualitative Data: The dataset lacked qualitative information such as client preferences, surrounding area characteristics, and specific construction methods. Incorporating such data could lead to more robust predictions.
  • Generalizability: While the methodology can be adapted to international contexts, specific cost structures and environmental impact factors would need localization.
  • Future Work: The authors recommend expanding the dataset, integrating qualitative data, and exploring more sophisticated regression techniques to further improve model accuracy, particularly for the design stage. They also suggest adapting the framework for global applications.

Summary updated

BibTeX
@inproceedings{kim2025advancing,
  author = {Joonsoo Kim},
  title = {{Advancing Sustainable Road Construction with Multiple Regression Analysis, Regression Tree Models, and Case-Based Reasoning for Environmental Load and Cost Estimation}},
  booktitle = {Buildings},
  year = {2025},
  doi = {10.3390/buildings15122083},
}
Figure