A Space Telescope Scheduling Approach Combining Observation Priority Coding with Problem Decomposition Strategies

Kaiyuan Zhang, Bao‐Lin Ye, Xiaoyun Xia, Zijia Wang, Xianchao Zhang, Hai JiangBiomimetics 2024 · DOI

TL;DR

This paper tackles the complex problem of scheduling space telescopes to observe an increasing amount of space debris. They introduce a novel heuristic algorithm that decomposes large scheduling problems into smaller ones, uses a priority-based coding/decoding system, and employs an adaptive variable neighborhood search to efficiently find optimal observation plans. This approach significantly speeds up computation for large-scale scenarios while maintaining high observation value.

What Problem Does This Paper Address?

The ever-growing amount of space debris poses a significant threat to operational spacecraft. To mitigate this, there's an increasing demand for telescopes to track and monitor this debris. The core challenge lies in efficiently scheduling these telescopes to maximize the observation of high-priority targets within their limited visibility windows. This becomes particularly difficult when dealing with a vast number of targets, leading to computationally intensive problems. Existing methods often struggle with the dimensionality and efficiency required for these large-scale scheduling tasks.

Methods

The authors propose a multi-faceted heuristic approach:

  • Problem Decomposition: To handle large-scale problems, the original scheduling problem is broken down into smaller, manageable sub-problems. This is achieved by sorting targets by their initial observation time and using a segmented time point to divide the data.
  • Priority Coding and Decoding: A novel coding method is introduced that prioritizes targets based on their entry into the observation queue, using actual observation data. This is complemented by a matching decoding method that determines which telescope observes a target and when. This system aims to reduce the solution space and improve efficiency.
  • Adaptive Variable Neighborhood Search (AVNS): For each sub-problem, an AVNS algorithm is employed. This algorithm dynamically adjusts the weights of different neighborhood search operators (insertion, commutative, two-opt) based on their success in finding better solutions, allowing for both broad and focused exploration of the solution space.

Datasets

The study utilizes "ten spatial target observation instances provided by relevant units," each containing approximately 9000 target observation units. These instances are categorized by difficulty (large-scale > 800 data points, medium-scale 500-800, small-scale < 500). The paper also provides a sample of target data in Table 1 for illustrative purposes.

Key Insights and Ideas

  • Decomposition is Key for Scale: Breaking down a massive scheduling problem into smaller, independent sub-problems is crucial for achieving computational efficiency without sacrificing solution quality.
  • Priority-Driven Scheduling: A coding and decoding scheme that leverages target priority and actual observation data effectively guides the scheduling process, making it more efficient than brute-force methods.
  • Adaptive Search for Robustness: The AVNS algorithm's ability to dynamically adapt its search strategy by adjusting operator weights allows it to navigate complex solution spaces and avoid getting stuck in local optima.
  • Trade-off in Decomposition: While decomposing the problem speeds up computation, excessive decomposition can lead to minor local optimality issues and requires careful consideration of parallel processing and communication between sub-problems.

Key Results

  • Significant Speedup: The problem decomposition strategy, when solving four sub-problems, achieved a solution speed approximately 29% of the original problem-solving time. The best solution quality was found when solving two sub-problems, taking about 47% of the original time.
  • Improved Decoding: The proposed decoding method significantly outperformed a greedy decoding method across all instances, achieving better total successful observation values.
  • Competitive Performance: The AVNS algorithm, combined with the proposed decoding method, demonstrated superior performance compared to Genetic Algorithm (GA) and Simulated Annealing (SA) in terms of maximum, average, and average count of observed targets, especially in more complex scenarios with fewer telescopes.
  • High Target Observation Rate: With five telescopes and 2000 data points, the algorithm ensured most targets were observed, with only a small fraction missed due to time constraints.

Limitations and Future Work

  • Observable Period Abandonment: The problem decomposition strategy currently abandons observable periods of targets that are too short after decomposition. Future work could explore how to incorporate these periods.
  • Deepening Coding/Decoding: Further research is suggested to improve the coding and decoding methods to further enhance search speed for very large problem dimensions.
  • Deep Reinforcement Learning: The authors propose exploring deep reinforcement learning for solving telescope scheduling problems.
  • Multi-Objective Optimization: Future work could investigate multi-objective algorithms to consider factors beyond scientific value, such as operating costs.
  • Telescope Number Optimization: Further research is needed to determine the optimal number of telescopes for the algorithm.

Summary updated

Abstract

With the increasing number of space debris, the demand for telescopes to observe space debris is also constantly increasing. The telescope observation scheduling problem requires algorithms to schedule telescopes to maximize observation value within the visible time constraints of space debris, especially when dealing with large-scale problems. This paper proposes a practical heuristic algorithm to solve the telescope observation of space debris scheduling problem. In order to accelerate the solving speed of algorithms on large-scale problems, this paper combines the characteristics of the problem and partitions the large-scale problem into multiple sub-problems according to the observation time. In each sub-problem, a coding method based on the priority of the target going into the queue is proposed in combination with the actual observation data, and a decoding method matching the coding method is designed. In the solution process for each sub-problem, an adaptive variable neighborhood search is used to solve the space debris observation plan. When solving all sub-problems is completed, the observation plans obtained on all sub-problems are combined to obtain the observation plan of the original problem.
BibTeX
@inproceedings{zhang2024space,
  author = {Kaiyuan Zhang and Bao‐Lin Ye and Xiaoyun Xia and Zijia Wang and Xianchao Zhang and Hai Jiang},
  title = {{A Space Telescope Scheduling Approach Combining Observation Priority Coding with Problem Decomposition Strategies}},
  booktitle = {Biomimetics},
  year = {2024},
  doi = {10.3390/biomimetics9120718},
}
Figure