Abstract
In stochastic linear systems, designing finite-horizon control policies requires balancing performance with probabilistic constraints on inputs and states. While this formulation is central to stochastic Model Predictive Control (MPC), it faces a critical challenge: if disturbances have unbounded support (e.g., Gaussian noise), the optimization problem may become infeasible. This paper introduces a novel constraint relaxation technique that recovers feasibility as quickly as possible through a cascade of two probabilistically-constrained optimization problems. Solved via a scenario-based scheme, the approach provides approximate solutions that satisfy original constraints with high confidence. Simulation results on a mechanical system demonstrate the effectiveness of this relaxation strategy compared to standard control methods.
Introduction
Stochastic Model Predictive Control (MPC) is a powerful framework for managing systems subject to random disturbances. By incorporating probabilistic (or "chance") constraints, engineers can specify a tolerable risk level—for example, ensuring a robotic arm stays within a safety zone 99% of the time. However, a fundamental issue arises when disturbances are "unbounded." In such cases, a rare but extreme sequence of noise realizations can push the system into a state where no feasible control input exists to satisfy the constraints in the next time step.
When these infeasible points are reached, standard MPC algorithms typically fail or "crash." This paper addresses this robustness gap by providing a mathematical safety net: a relaxation technique that allows the controller to continue functioning by intelligently and minimally violating constraints only when absolutely necessary.
Methodology: The Two-Step Cascade
To handle infeasibility, the authors propose a two-step cascade optimization strategy. This approach ensures that the controller prioritizes system safety and feasibility recovery before optimizing for performance.
1. Feasibility Recovery (Step 1)
The algorithm first solves an optimization problem to find the smallest possible relaxation vector, $h$, that makes the probabilistic constraints feasible. This step essentially asks: "What is the minimum amount I need to stretch the safety bounds to find a valid control path?" By minimizing $h$, the controller ensures the system returns to the original safe operating region as quickly as possible.
2. Performance Optimization (Step 2)
Once the minimum relaxation $h$ is determined, the algorithm solves a second optimization problem. This step minimizes the actual control cost (such as energy consumption or tracking error) while respecting the newly relaxed constraints defined in Step 1. The authors demonstrate that if the cost functions are strictly convex, this two-step process uniquely determines the optimal control action, preventing ambiguity or "chatter" in the control signal.
The Scenario Approach
Solving chance-constrained problems is often computationally intractable (NP-hard). To overcome this, the authors employ the Scenario Approach. Instead of calculating complex integrals over probability distributions, the method takes $N$ random samples (scenarios) of the disturbance. The probabilistic constraint is then replaced by $N$ hard constraints—one for each sample.
A core theoretical contribution of this work is Theorem 1, which provides a rigorous bound on the number of samples $N$ required to guarantee that the resulting policy satisfies the original probabilistic constraints with a specific user-defined confidence level. Notably, $N$ scales logarithmically with the confidence parameter, meaning high reliability (e.g., 99.99%) can be achieved without a prohibitive increase in computational cost.
Experimental Evaluation
The proposed method was evaluated using a simulated mechanical system consisting of four masses connected by four springs. The system's state included the displacements and velocities of the masses, subject to additive stochastic noise. The primary constraints were limits on the maximum speed of each mass.
Key Results
The scenario-based relaxation controller was compared against a standard Linear Quadratic (LQ) controller:
- Feasibility Recovery: The simulation began at an initial state where original constraints were mathematically impossible to meet. The proposed controller successfully identified this and calculated the minimum necessary relaxation ($h_1 = 1.62, h_2 = 1.08$) to maintain operation.
- Constraint Satisfaction: The method maintained an actual violation probability ($\tilde{\epsilon} = 0.1248$) very close to the target threshold ($\epsilon = 0.1$), even under these adverse conditions.
- Performance Gap: In contrast, the LQ controller failed significantly. When tuned for performance, it violated constraints 100% of the time. When tuned conservatively, its performance cost was nearly double that of the proposed method, and it still suffered from high violation rates during the initial recovery phase.
Discussion and Conclusion
This research provides a robust framework for "graceful degradation" in stochastic control. By automating the relaxation process, the controller eliminates the need for manual tuning of soft constraints. The system remains optimal under normal conditions and transitions seamlessly to a recovery mode when pushed into infeasibility by extreme noise.
While the scenario approach is computationally tractable, the number of constraints grows linearly with the number of scenarios $N$, which may pose challenges for high-dimensional systems or very fast sampling rates. Future work remains to be done in proving "recursive feasibility"—the guarantee that the system will remain solvable for all future time steps—under the specific conditions of unbounded disturbances. Nevertheless, this cascade approach represents a significant step forward in making stochastic MPC viable for real-world applications where safety and continuity are paramount.
Summary updated