A hybrid Graph-based Machine Learning Model for predicting Delivery Times in Supply Chain Logistics

Mattia Volpato, Andrea Giuseppe Landella, Bruno PuzzolantearXiv 2026

Imagine your company’s supply chain as a vast, interconnected nervous system. When a supplier in Shenzhen hits a snag or a winter storm slows down a carrier in the Alps, the "pain" doesn't stay local—it ripples through the entire network, eventually causing a headache for the manufacturer waiting on parts.

In a world defined by "VUCA" (Volatility, Uncertainty, Complexity, and Ambiguity), simply knowing where your truck is isn't enough. You need to know when it will actually arrive, accounting for everything from supplier lethargy to a traffic jam on the A4.

TL;DR

This paper introduces a hybrid "GPS for logistics" that combines graph theory with machine learning to predict delivery delays before they propagate. By treating the supply chain as a probabilistic network (a Markov chain) and feeding real-time weather and traffic data into an XGBoost model, the authors created a system that cuts prediction errors by nearly 30%.

What Problem Does This Paper Address?

Most logistics models suffer from "tunnel vision." They either focus purely on external risks (like a hurricane) or treat the shipping leg as an isolated event.

The authors identify a critical gap at the operational layer. Specifically, they point out that "internal" disruptions—like a supplier taking three days to pack a box instead of one—are often ignored. Furthermore, existing models are frequently too "data-hungry" for real-world industrial settings, where tracking data is often sparse, messy, or incomplete. The goal here was to build a lightweight, interpretable framework that tracks an order from the moment it's placed until it hits the factory floor.

Figure 1: Sequence diagram of the order fulfilment process. The manufacturer places an order with the supplier (1), who prepares and dispatches it (2). The supplier books the shipment with a third-party logistics (3PL) provider (3a), which plans the load and assigns a carrier (3b); the goods are then handed over to the carrier for pickup (3c). The carrier ships the goods and tracks them, reporting tracking events to the 3PL (4a), which forwards status updates to the manufacturer (4b). The carrier delivers the shipment to the manufacturer (5), who confirms delivery (6a), after which the carrier closes the shipment with the 3PL (6b). The bold blue markers indicate the order time, shipment time, and delivery time as timestamps referenced throughout the LCDI framework.

Methods

The researchers built a hybrid architecture they call the SCGM-LCDI framework. Here’s the breakdown:

  1. The Supply Chain Graph Model (SCGM): They represent the logistics network as a Directed Acyclic Graph (DAG). Nodes are physical locations (suppliers, hubs, factories), and edges are the routes between them.
  2. Stochastic Routing: Instead of assuming a truck always takes the same path, they use Markov chains. By looking at historical data, they calculate the probability of a shipment moving from point A to point B. This allows the model to "guess" the likely path of a shipment even before it starts moving.
  3. Logistics Chain Disruption Indicators (LCDIs): This is a hierarchical set of metrics. It splits the journey into two main phases: Dispatch (the time at the supplier) and Shipment (the time on the road).
  4. The ML Engine: For the "on the road" part, they use XGBoost, a powerful gradient-boosting algorithm. They feed it "meta-indicators" for traffic and weather, alongside geodesic distances, to predict a Dynamic Route Time (DRT).
  5. The Convex Combination: This is the "secret sauce." As a shipment progresses, the model shifts its weight. Early on, it relies more on historical averages (Transit Time). As real-time data flows in, it pivots to trust the ML-driven Path Time more.
Figure 2: Supply Chain Graph representation. Supplier sites constitute the source vertices and are shown in red, intermediate logistics nodes are shown in light blue, and the manufacturer acts as the sink vertex, shown in green. A route r is a single edge connecting two vertices, and a path π is any walk from a source to the sink vertex. The graph shown is a simplified representation with |S| = 3 supplier sites, |I| = 6 intermediate nodes, and a single manufacturer, for a total of |V | = 10 vertices. A route is exemplified in red r = (s1, i1), and a path is exemplified in blue π = (s2, i1, i4, m).

Datasets

The model was battle-tested using real-world data from FAE Technology S.p.A., an Italian electronics firm.

  • Internal Data: 6,551 order records, though only 98 had the high-quality tracking links needed for deep analysis.
  • External Data: The team integrated several APIs to "featurize" the environment:
  • 17Track for shipping events.
  • TomTom for real-time traffic.
  • Visual Crossing for weather conditions.
  • Calendarific to account for local holidays at supplier sites.

Key Insights and Ideas

  • The "Dispatch" Gap: The authors found that supplier readiness is a massive variable. By creating an Estimated Dispatch Time (EDT) indicator, they could account for the "black hole" of time between an order being placed and the carrier actually picking it up.
  • Granularity Matters: The model predicts at an hourly resolution, but the authors found that daily discretization is better for business. It filters out the "noise" of minor hourly fluctuations while providing the stable, actionable windows that logistics managers actually need.
  • Probabilistic Paths: By using Markov chains, the model doesn't just predict one arrival time; it can aggregate the expected times across all possible paths a carrier might take, weighted by how likely they are to take them.
Figure 3: Time sequence of the order fulfilment process. As introduced in Figure 1, the order fulfilment process comprises the time between order placement and delivery. The total time is decomposed into two components: the dispatch interval, from the order time t0(s) to the shipment time t1(s, c), and the shipment interval, from t1(s, c) to the delivery time tn(s, c). Since these times are generated by individual orders, they are inherently order- and carrier-dependent, and are to be understood as such throughout, even where the dependence is omitted from the notation for brevity.

Key Results

The hybrid approach significantly outperformed the historical baseline:

  • Error Reduction: The Mean Absolute Error (MAE) dropped from 1.60 days to 1.12 days.
  • Relative Accuracy: The Mean Absolute Percentage Error (MAPE) was nearly halved, falling from 0.77% to 0.44%.
  • Real-world Validation: The framework was embedded into a web application (M4SCARA) for the M4ESTRO project, successfully enabling early detection of disruptions for industrial partners.

Limitations and Future Work

The biggest hurdle was data scarcity. With only 98 valid tracking sequences, the model's statistical confidence intervals were relatively wide.

The authors suggest that future work should move toward Quantile Regression. Instead of predicting a single "best guess" for arrival, this would provide a range (e.g., "there is a 90% chance it arrives between Tuesday and Thursday"), which is even more useful for risk-averse supply chain planners. They also hope to expand the model to "multi-manufacturer" environments, allowing data to be pooled across different companies to solve the small-sample size problem.

Summary updated

BibTeX
@misc{volpato2026hybrid,
  author = {Mattia Volpato and Andrea Giuseppe Landella and Bruno Puzzolante},
  title = {{A hybrid Graph-based Machine Learning Model for predicting Delivery Times in Supply Chain Logistics}},
  year = {2026},
  eprint = {2611.28467},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.28467},
}
Figure