INFRISK: A Computer Simulation Approach to Risk Management in Infrastructure Project Finance Transactions

Mansoor Dailami, Ilya Lipkovich, Van John DyckWorld 1999 · OpenAlex

Abstract

No AccessPolicy Research Working Papers21 Jun 2013INFRISK: A Computer Simulation Approach to Risk Management in Infrastructure Project Finance TransactionsAuthors/Editors: Mansoor Dailami, Ilya Lipkovich, Van John DyckMansoor Dailami, Ilya Lipkovich, Van John Dyckhttps://doi.org/10.1596/1813-9450-2083SectionsAboutPDF (0.4 MB) ToolsAdd to favoritesDownload CitationsTrack Citations ShareFacebookTwitterLinked In Abstract:Increased exposure to risk has been an inevitable consequence of recent economic, technological, and financial changes, the defining themes of the 1990s. In the face of such developments, the viability of long-term capital investments-particularly in the core infrastructure sectors of power, transport, and telecommunications-hinges critically on how the risks associated with such investments are evaluated and managed. Few issues in modern finance have inspired the interest of both practitioners and theoreticians more than risk evaluation and management. The basic principle governing risk management in an infrastructure project finance deal is intuitive and well-articulated: allocate project-specific risks to parties best able to bear them (taking into account each party's appetite for, and aversion to, risk); control performance risk through incentives; and use market hedging instruments (derivatives) for covering marketwide risks arising from fluctuations in, for instance, interest and exchange rates, among other things. In practice, however, governments have been asked to provide guarantees for various kinds of projects, often at no charge, because of problems associated with market imperfections: ° Derivative markets (swaps, forwards) for currency and interest-rate risk hedging either do not exist or are inadequately developed in most developing countries. ° Limited contracting possibilities (because of problems with credibility or enforcement). ° Differing methods for risk measurement and evaluation. Two factors distinguish the financing of infrastructure projects from corporate and traditional limited-recourse project finance: 1) a high concentration of project risk early in the project life cycle (pre-completion), and 2) a risk profile that changes as the project comes to fruition, with a relatively stable cash flow subject to market and regulatory risk once the project is completed. Dailami, Lipkovich, and Van Dyck introduce INFRISK, a computer-based risk-management approach to infrastructure project finance transactions that involve the private sector. Developed in-house in the Economic Development Institute of the World Bank, INFRISK is a guide to practitioners in the field and a training tool for raising awareness and improving expertise in the application of modern risk management techniques. INFRISK can analyze a project's exposure to a variety of market, credit, and performance risks from the perspective of key contracting parties (project promoter, creditor, and government). Their model is driven by the concept of the project's economic viability. Drawing on recent developments in the literature on project evaluation under uncertainty, INFRISK generates probability distributions for key decision variables, such as a project's net present value, internal rate of return, or capacity to service its debt on time during the life of the project. Computationally, INFRISK works in conjunction with Microsoft Excel and supports both the construction and the operation phases of a capital investment project. For a particular risk variable of interest (such as the revenue stream, operations and maintenance costs, and construction costs, among others) the program first generates a stream of probability distributions for each year of a project's life through a Monte Carlo simulation technique. One of the key contributions made by INFRISK is to enable the use of a broader set of probability distributions (uniform, normal, beta, and lognormal) in conducting Monte Carlo simulations rather than relying only on the commonly used normal distribution. A user's guide provides instruction on the use of the package. This paper-a product of the Regulatory Reform and Private Enterprise Division, Economic Development Institute-is part of a larger effort in the institute to address the training needs of Bank client countries as well as support the Bank's own lending and advisory services in promoting infrastructure development and modernization in developing countries. The authors may be contacted at [email protected], [email protected], or [email protected] Previous bookNext book FiguresreferencesRecommendeddetailsCited byNew Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction RisksJournal of Construction Engineering and Management, Vol.143, No.1Evaluation of Highway Projects under Government Support Mechanisms Based on an Option-Pricing FrameworkJournal of Construction Engineering and Management, Vol.142, No.4A discussion of the financial valuation of transmission line assets and asset renewal projectsReal option theory for risk mitigation in transport PPPsBuilt Environment Project and Asset Management, Vol.3, No.2Alternative to Government Revenue Guarantees: Dynamic Revenue Insurance ContractsJournal of Infrastructure Systems, Vol.19, No.3A modeling government revenue guarantees in privately built transportation projects: a risk-adjusted approachTransport, Vol.28, No.216 July 2013Real Options–Based Approach for Valuation of Government Guarantees in Public–Private PartnershipsJournal of Infrastructure Systems, Vol.19, No.2Public-private partnership: improving landscape quality of modern communitiesJournal of Architecture and Urbanism, Vol.37, No.1Contractual Flexibility28 March 2013Optimal Capital Structure and Financial Risk of Project Finance Investments: A Simulation Optimization Model With Chance ConstraintsThe Engineering Economist, Vol.58, No.1Traffic and revenue forecast at risk for a BOT road projectKSCE Journal of Civil Engineering, Vol.16, No.61 September 2012Critiques of the existing techniques for the evaluation of renewable energy projectsMezzanine Capital and Corporate Bonds - The Czech ExperienceDevelopment of Business English Language Communicative SkillsMen on Parental Leave in HungaryAttitudes and Perceptions Regarding Entrepreneurship Around the World: A Cluster Analysis ApproachViešojo ir privačiojo sektorių partnerystė: miesto teritorijų plėtros perspektyvosVerslas: teorija ir praktika, Vol.12, No.3Feasibility study of public-private partnershipInternational Journal of Strategic Property Management, Vol.15, No.35 October 2011Selecting BOT/PPP Infrastructure Projects for Government Guarantee Portfolio under Conditions of Budget and Risk in the Indonesian ContextJournal of Construction Engineering and Management, Vol.137, No.7Towards an approach for measuring the risk-bearing capacity of construction contractsSimulation-Based Valuation of Project Finance - Does Model Complexity Really Matter?SSRN Electronic JournalModelling completion risk using stochastic critical path‐envelope method: a BOT highway project applicationConstruction Management and Economics, Vol.28, No.12Collar options to manage revenue risks in real toll public‐private partnership transportation projectsConstruction Management and Economics, Vol.28, No.10Variance models for project financial risk analysis with applications to greenfield BOT highway projectsConstruction Management and Economics, Vol.26, No.9Valuing Simple Multiple-Exercise Real Options in Infrastructure ProjectsJournal of Infrastructure Systems, Vol.13, No.2Decision Support System to Evaluate and Compare Concession OptionsJournal of Construction Engineering and Management, Vol.133, No.2Measuring Value-at-Risk in Project Finance TransactionsEuropean Financial Management, Vol.13, No.1Using Real Options for Revenue Risk Mitigation in Transportation Project FinancingTransportation Research Record: Journal of the Transportation Research Board, Vol.1993, No.122 May 2018Generalized Economic Modeling for Infrastructure and Capital Investment ProjectsJournal of Infrastructure Systems, Vol.12, No.1Financial Risk Analysis of Project Finance in Indonesian Toll RoadsJournal of Construction Engineering and Management, Vol.131, No.9Valuing guarantees in a BOT infrastructure projectEngineering, Construction and Architectural Management, Vol.11, No.6Conceptual Issues in Financial Risk Analysis: A Review for PractitionersSSRN Electronic Journal View Published: March 1999 Copyright & Permissions Related CountriesCubaCzech RepublicMonacoUruguayRelated TopicsFinance and Financial Sector DevelopmentMacroeconomics and Economic GrowthPrivate Sector Development KeywordsCAPITAL FLOWSCAPITAL INVESTMENTSCURRENCYDERIVATIVESECONOMIC DEVELOPMENTEXCHANGEFINANCEGLOBALIZATIONINSTRUMENTSINTERESTINVESTMENTLONG-TERM CAPITALMARKETMARKETSPERFORMANCE RISKRETURNRISK EVALUATIONRISK MANAGEMENTTELECOMMUNICATIONSTRANSACTIONS PDF DownloadLoading ...
BibTeX
@inproceedings{dailami1999infrisk,
  author = {Mansoor Dailami and Ilya Lipkovich and Van John Dyck},
  title = {{INFRISK: A Computer Simulation Approach to Risk Management in Infrastructure Project Finance Transactions}},
  booktitle = {World},
  year = {1999},
  doi = {10.1596/1813-9450-2083},
}

Loading related content...

Figure