Abstract
The Baise Water Conservancy Project is the second cascade in the Yujiang River planning, serving as a vital link between Yunnan and Guizhou. The exit of its downstream approach channel is located approximately 700 m downstream of the Dongsun Hydropower Station, making navigation conditions highly sensitive to the station's operation and local river topography. This study utilizes a 1:80 scale hydraulic model and self-navigating ship simulations to evaluate and optimize these conditions. Results demonstrate that while the original design supports safe navigation up to a discharge of 1500 $m^3/s$, specific optimizations—including route adjustments and dredging of rocky protrusions—can increase the maximum navigable discharge to 1700 $m^3/s$.
Introduction
The downstream approach channel is a critical bottleneck for the Baise Water Conservancy Project. Proximity to the Dongsun Hydropower Station introduces complex hydraulic phenomena, such as oblique flows and intense eddies, which are exacerbated by the river's narrow, winding geometry. Ensuring safe passage for 1000-ton class vessels requires a detailed understanding of how hydropower operations interact with these topographical constraints.
Methodology
The research employed a two-fold experimental approach:
- Physical Hydraulic Modeling: A 1:80 scale model was used to simulate river flow. Researchers utilized DPJ propeller current meters and wave height sensors to monitor conditions across discharge scenarios ranging from 600 to 2000 $m^3/s$.
- Ship Simulation: A 1:80 scale self-propelled model ship was tracked using a multilateral wireless positioning system. Four shore-based stations monitored tags on the ship’s bow and stern, allowing for precise calculation of trajectories, drift angles, and the frequency of pilot steering corrections.
Flow Condition Analysis
Analysis revealed that "convex points" (rocky protrusions) on the right bank were the primary source of dangerous transverse flows, forcing ships into difficult "S" shaped maneuvers. Under baseline conditions, navigation remained safe as long as the hydropower station discharge did not exceed 1500 $m^3/s$. Beyond this point, transverse velocities surpassed the 0.3 m/s safety threshold.
Optimization and Results
To enhance capacity, three optimization schemes were tested. The most successful (Scheme 3) involved shifting the navigation route 3.7° toward the left bank and dredging two key convex points on the right bank.
This optimized configuration successfully increased the maximum navigable discharge to 1700 $m^3/s$, equivalent to a 1-in-5-year flood event. Under these conditions, longitudinal velocities were maintained below 2.0 m/s, and the ship could enter and exit the downstream approach channel smoothly without exceeding rudder or drift angle requirements.
Conclusion
The integration of physical modeling and real-time ship simulation provided a comprehensive solution for the Baise Water Conservancy Project. The study confirms that targeted topographical dredging and route adjustments are effective strategies for mitigating the hydraulic impacts of nearby hydropower operations, ensuring the long-term viability of this regional shipping corridor.