Experimental Study on Navigation Flow Condition of Downstream Approach Channel of Navigation Facilities of Baise Water Conservancy Project

Kaiwen Yu, Changhai Han, Kang Han, Jianjun Zhao, Zhiguang YuLecture Notes in Civil Engineering 2023 · OpenAlex

Abstract

The Baise Water Conservancy Project is the second cascade in the Yujiang River planning, serving as a vital link between Yunnan and Guizhou. The exit of its downstream approach channel is located approximately 700 m downstream of the Dongsun Hydropower Station, making navigation conditions highly sensitive to the station's operation and local river topography. This study utilizes a 1:80 scale hydraulic model and self-navigating ship simulations to evaluate and optimize these conditions. Results demonstrate that while the original design supports safe navigation up to a discharge of 1500 $m^3/s$, specific optimizations—including route adjustments and dredging of rocky protrusions—can increase the maximum navigable discharge to 1700 $m^3/s$.

Introduction

The downstream approach channel is a critical bottleneck for the Baise Water Conservancy Project. Proximity to the Dongsun Hydropower Station introduces complex hydraulic phenomena, such as oblique flows and intense eddies, which are exacerbated by the river's narrow, winding geometry. Ensuring safe passage for 1000-ton class vessels requires a detailed understanding of how hydropower operations interact with these topographical constraints.

Overview of the Baise Water Conservancy Project layout and the designated range for hydraulic model testing.

Methodology

The research employed a two-fold experimental approach:

  1. Physical Hydraulic Modeling: A 1:80 scale model was used to simulate river flow. Researchers utilized DPJ propeller current meters and wave height sensors to monitor conditions across discharge scenarios ranging from 600 to 2000 $m^3/s$.
  2. Ship Simulation: A 1:80 scale self-propelled model ship was tracked using a multilateral wireless positioning system. Four shore-based stations monitored tags on the ship’s bow and stern, allowing for precise calculation of trajectories, drift angles, and the frequency of pilot steering corrections.

Flow Condition Analysis

Analysis revealed that "convex points" (rocky protrusions) on the right bank were the primary source of dangerous transverse flows, forcing ships into difficult "S" shaped maneuvers. Under baseline conditions, navigation remained safe as long as the hydropower station discharge did not exceed 1500 $m^3/s$. Beyond this point, transverse velocities surpassed the 0.3 m/s safety threshold.

Visualization of flow patterns and the range of backflow under experimental Condition 5.

Optimization and Results

To enhance capacity, three optimization schemes were tested. The most successful (Scheme 3) involved shifting the navigation route 3.7° toward the left bank and dredging two key convex points on the right bank.

This optimized configuration successfully increased the maximum navigable discharge to 1700 $m^3/s$, equivalent to a 1-in-5-year flood event. Under these conditions, longitudinal velocities were maintained below 2.0 m/s, and the ship could enter and exit the downstream approach channel smoothly without exceeding rudder or drift angle requirements.

Conclusion

The integration of physical modeling and real-time ship simulation provided a comprehensive solution for the Baise Water Conservancy Project. The study confirms that targeted topographical dredging and route adjustments are effective strategies for mitigating the hydraulic impacts of nearby hydropower operations, ensuring the long-term viability of this regional shipping corridor.

Summary updated

Abstract

Abstract Baise Water Conservancy Project is the second cascade in the Yujiang River planning, and its navigation facilities are one of the key projects to get through Yunnan and Guizhou. The exit of the downstream approach channel of the navigation facilities of the Baise Water Conservancy Project is located about 700 m downstream of the Dongsun Hydropower Station, so the operation of Dongsun Hydropower Station has a direct impact on the navigation flow condition of the approach channel. In addition, the topography of the river also has an obvious influence on the navigation conditions at the entrance area of the approach channel. So, based on the overall hydraulic model with a scale of 1:80 and the self-navigating ship simulation test, the navigation flow conditions at the entrance area of the approach channel and the characteristics of the ship entering and exiting the ship lock were studied. The test results show that: (1) Under the condition that the discharge of Dongsun Hydropower Station is less than1500 m 3 /s at full power, the flow pattern in the downstream channel of the hydropower station and the entrance area of the approach channel is relatively smooth. The flow pattern, velocity and wave height can meet the specification requirements. The maximum rudder angle and drift angle at the entrance area of the approach channel do not exceed the requirements, and the ship can enter and exit the downstream approach channel smoothly; (2) The maximum navigation discharge of 1700 m 3 /s can be achieved by adjusting the route of the connecting section of the downstream approach channel to the left bank and dredging the two convex points on the right bank of the entrance area of the downstream approach channel.
BibTeX
@inproceedings{yu2023experimental,
  author = {Kaiwen Yu and Changhai Han and Kang Han and Jianjun Zhao and Zhiguang Yu},
  title = {{Experimental Study on Navigation Flow Condition of Downstream Approach Channel of Navigation Facilities of Baise Water Conservancy Project}},
  booktitle = {Lecture Notes in Civil Engineering},
  year = {2023},
  doi = {10.1007/978-981-19-6138-0\_130},
}

Loading related content...

Figure