NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

A two-stage approach for collaborative scheduling of closed-loop manufacturing considering dynamic power cost: An enhanced Benders decomposition optimization

Chen Chen, Gaolong Wang, Shan Lu, Xinchao LiComput. Ind. Eng 2026

BibTeX
@article{chen2026two,
  author = {Chen Chen and Gaolong Wang and Shan Lu and Xinchao Li},
  title = {{A two-stage approach for collaborative scheduling of closed-loop manufacturing considering dynamic power cost: An enhanced Benders decomposition optimization}},
  journal = {Comput. Ind. Eng.},
  year = {2026},
  doi = {10.1016/j.cie.2026.111890},
}

Loading related content...

Figure