What Fuzzy Travel Times Buy in Vehicle Routing When Delay Data Are Scarce

Delivery companies plan routes from travel-time estimates. When those estimates are wrong, trucks arrive late, customers get penalty payments, and planners respond by adding fleet capacity they do not need. Two camps claim to handle this uncertainty. Stochastic programmers sample scenarios from fitted probability distributions. Fuzzy-logic researchers describe each travel time as a graded range, a "fuzzy number" whose membership function says how plausible each value is, and then do arithmetic on those ranges. The two camps have never been tested against each other on a realistic routing benchmark. The fuzzy side in logistics has been evaluated almost entirely on stylized numerical examples. This proposal runs that comparison, and it is built so that a negative result is as informative as a positive one.

The core observation is mechanical. When you add triangular or trapezoidal fuzzy numbers along a route, the uncertainty ranges add linearly. Mathematically this is the same as summing per-arc quantiles, which implicitly assumes that delays on successive arcs move together. Probabilistic methods that treat arcs as independent let spreads grow roughly with the square root of route length instead. We therefore predict that fuzzy arrival-time reasoning helps exactly when two conditions hold: delays are positively correlated (rush-hour peaks, accidents that spill across a district) and there are too few historical observations to estimate that correlation. We also predict that it is indistinguishable from a properly chosen quantile buffer otherwise. The claim is narrow and falsifiable. It turns a vague "fuzzy logic is robust" argument into a measurable statement about correlation and sample size.

Core Claim

For a route visiting arcs $1,\dots,n$, the latest plausible arrival at the $n$-th stop under a fuzzy travel-time model, at confidence level $\alpha \in [0,1]$, is

$$\bar{A}_n(\alpha) = \sum_{i=1}^{n} \bar{t}_i(\alpha),$$

where $\bar{t}_i(\alpha)$ is the upper end of arc $i$'s fuzzy travel time at membership level $\alpha$. This upper end is taken at the "alpha-cut", the set of values whose membership is at least $\alpha$. An independent-Gaussian chance constraint instead uses $\sum_i \mu_i + z\sqrt{\sum_i \sigma_i^2}$, where $\mu_i$ and $\sigma_i$ are the arc's mean and standard deviation and $z$ is a normal quantile. The first rule is conservative under weak correlation and accurate under strong positive correlation. The second rule is the reverse.

We claim three things. First, fuzzy alpha-cut routing reduces late-arrival cost on realistic stochastic instances when per-arc history is sparse (a handful of observations per arc and time-of-day bin) and delays are correlated. Second, its advantage over a comonotonic quantile buffer comes only from graded lateness scoring, if it comes at all. "Comonotonic" means each arc's quantile is summed as though all arcs were perfectly correlated, which is exactly the fuzzy rule restated in probabilistic terms. Third, with abundant data, scenario-based sample average approximation should win. Sample average approximation (SAA) optimizes the average cost over sampled travel-time scenarios. The proposal is built to locate the crossover point, not to declare fuzzy logic a winner.

Relation to Prior Work

The motivating evidence comes from benchmark work on the empirical validation gap. SVRPBench builds 500+ urban routing instances with time-dependent congestion peaks, bursty log-normal delays, and Poisson accident shocks. It shows that learned solvers degrade by "over 20%" under these conditions, while Google OR-Tools achieves "the best overall cost". It evaluates no fuzzy method, and that omission is the gap we fill.

Contextual Stochastic Vehicle Routing with Time Windows supplies the main competitor and a constraint on our design. It shows that conditional and residual-based scenario methods get within "0.1% to 4%" of full information on Solomon instances. It also shows that point predictions fail because lateness penalties are asymmetric. However, it assumes 100 historical periods and Gaussian-generated travel times, so it never tests the scarce-data regime.

Fuzzy logic enters logistics in two existing ways, and neither touches operational uncertainty under benchmark conditions. The first is as a scoring or allocation device in profit-sharing and siting. Examples include trapezoidal fuzzy profit allocation in cold chains, the fuzzy Shapley value for forest e-commerce, and fuzzy evaluation for outlet siting. The second is as an internal search representation, as in the hierarchical fuzzy graph for multi-echelon location-routing. That work uses fuzzy memberships for soft assignment between echelons on synthetic instances, not for travel-time uncertainty.

The general argument that graded memberships avoid brittle thresholds is supported outside routing, in fuzzy QoS multicast routing and fuzzy port resilience decision support. We test whether that argument survives contact with a realistic simulator.

The bi-level flexible time window model shows that softened windows cut costs substantially, with fee reductions "exceeding 25%". It also warns that soft windows are a strong, simple competitor to any fuzzy lateness scheme. We treat it that way.

Research Program

We build one routing pipeline on OR-Tools so that every method shares the same search engine and differs only in how travel times and lateness enter the model. The pipeline works in three steps:

  1. Build fuzzy travel times. For each arc and time-of-day bin, we form a trapezoidal fuzzy travel time from the $k$ available observations. The core is the observed range. The support is widened by a small-sample rule calibrated on held-out instance families. Optionally, a coarse linguistic prior ("peak", "off-peak", "accident-prone district") is derived from the benchmark's congestion structure. For $k=0$ only this prior is used.
  2. Route against fuzzy arrivals. The route-feasibility check uses the alpha-cut arrival bound above. The level $\alpha$ is tuned on validation instances.
  3. Score lateness by grade. A second variant replaces hard window feasibility with a graded satisfaction penalty: one minus the membership of the predicted arrival in a trapezoidal "acceptable arrival" set.

All methods are evaluated out of sample. Each plan is replayed against a large number of fresh draws from the SVRPBench stochastic engine, with no re-optimization during execution. Every result therefore reflects the real cost of the plan, not the model's belief about it.

Two factors are varied deliberately. The first is history size, with $k \in \{0, 3, 10, 30, 100\}$ per arc-bin. The second is delay correlation. We use SVRPBench's native accident and peak structure, a version with accident rate raised, and a decorrelated control in which each arc's delay is resampled independently with unchanged marginal distribution. The correlation manipulation is what makes the core claim testable: if fuzzy gains persist in the decorrelated control, our mechanism is wrong.

Baselines

Do-nothing reference. OR-Tools planning on mean travel times with hard windows, replayed in the simulator. This measures how much any uncertainty handling helps at all.

Fixed-percentage buffer. OR-Tools with travel times inflated by a uniform margin. The margin is tuned on the same validation instances and with the same tuning budget as the fuzzy $\alpha$. This is the cheapest competitor practitioners would actually deploy.

Independent-Gaussian chance buffer. Per-arc means and variances are estimated from the same $k$ samples. Arrivals are buffered with the square-root rule.

Comonotonic quantile buffer (key ablation). Per-arc empirical quantiles from the same $k$ samples are summed along the route. This isolates the proposal's key ingredient. If the fuzzy method only matches this buffer, the "fuzzy" label adds nothing beyond linear spread accumulation, and we will report it that way.

OR-Tools soft time windows. Linear lateness penalties, following the spirit of the flexible time window work. This isolates whether graded lateness scoring adds anything beyond a linear penalty.

Scenario sample average approximation. We run it inside the same OR-Tools search using the same $k$ samples. On Solomon instances, where the contextual stochastic routing protocol supplies features, we also run its conditional variant. We cannot afford its exact branch-price-and-cut solver (up to five hours per 100-node instance), so we use a matched-time heuristic and report the gap to their published numbers. Their reported figure is that conditional and residual SAA come within 0.1–4% of full-information cost on Solomon R1, C1 and RC1. Beating this baseline at $k=100$ is not expected. Beating it at $k \le 10$ by a margin larger than the seed-to-seed spread is the target.

Learned solvers. We cite the SVRPBench POMO and attention-model results and, where code permits, reproduce them. Their reported degradation is "over 20%" relative to classical metaheuristics.

What counts as success. For the strongest SVRPBench baseline, OR-Tools, the file gives a ranking but no per-instance cost value. No reported result was found on Lacuna for an OR-Tools absolute cost on SVRPBench, so we recompute it. Beating it means lower expected total cost (travel plus lateness penalty plus fleet cost) with non-overlapping 95% bootstrap intervals over instances, at equal wall-clock budget.

Why not just…?

Why not just add a tuned safety margin in OR-Tools? This is a real threat. A uniform margin ignores which arcs are volatile, so it should waste slack on calm arcs and under-protect accident-prone ones. Whether that matters is exactly what the tuned-buffer baseline measures. If the margin matches fuzzy routing across all $k$ and all correlation settings, the honest conclusion is that per-arc uncertainty structure is not worth modeling on this benchmark, and we will say so.

Why not just use soft time windows with linear penalties? A trapezoidal satisfaction function is a piecewise-linear penalty, so graded fuzzy lateness may reduce to soft windows with a different slope. The soft-window baseline is matched in tuning budget for this reason. We expect the graded-scoring variant to give at most a small edge, and the experiment shows directly whether that edge exists.

Why not just use scenario sampling, which is mathematically better founded? With abundant history it should win. The contextual routing results put it within a few percent of full information. Its weakness is that a handful of samples per arc cannot reveal cross-arc correlation, so independent scenarios understate the risk of a shared slowdown. The $k$-sweep combined with the decorrelated control shows whether this weakness is real and where the crossover sits.

Why not just use deep reinforcement learning, which needs no hand-built rules? SVRPBench already reports that these solvers degrade by more than 20% under realistic noise. The RL time-window solver has been tested only on clean synthetic instances of up to 100 nodes. Learned solvers are useful as speed references but are unlikely to be the strongest competitor here.

Proposed Experiments

Main experiment. The full sweep of methods by history size by correlation regime on SVRPBench, from 50 to 1,000 customers, with and without time windows. We report:

  • expected out-of-sample cost,
  • late-arrival rate,
  • vehicles used,
  • planning wall-clock time,
  • peak memory.

Reporting time and memory addresses the validation-gap concern that robustness methods are rarely costed in practice.

Decisive check 1 (mechanism). Fuzzy routing's advantage over the independent-Gaussian buffer should shrink toward zero in the decorrelated control and grow with accident rate. If it does not, the correlation explanation is false.

Decisive check 2 (crossover). Plotting cost against $k$ should show fuzzy routing ahead at small $k$ and scenario SAA ahead at large $k$. A crossover point that is stable across instance sizes would be the practically useful output: a rule for when a newly opened delivery zone should use fuzzy intervals and when it should switch to scenarios.

Decisive check 3 (what is actually fuzzy). Fuzzy routing is compared against the comonotonic quantile buffer and against soft windows. This tells us whether anything specific to fuzzy logic survives once its arithmetic is translated into probabilistic terms.

Secondary experiment. A replication on Solomon instances under the contextual routing protocol connects our results to the published 0.1–4% gaps.