NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Oldest-First Scheduling on Multi-Rate Channels: Where Capacity Magnitude Makes It Hard

Wireless downlink schedulers that always serve the packet that has waited longest have a strong track record. They prevent the "last packet problem," where a few leftover packets starve because nothing behind them builds up queue pressure. They also come with sharp delay guarantees. Those guarantees rest on one simplification: each frequency channel carries at most one packet per time slot. Real cellular links adapt their modulation to channel quality, a technique called adaptive modulation and coding, so a channel may carry anywhere from 0 to K packets in a slot. Once capacities are integers up to K, deciding which user gets each channel so that the oldest packets leave first stops being a simple matching problem. It becomes a number-packing problem that looks like Partition. Such problems are typically solvable only in pseudo-polynomial time, meaning the running time grows with the numerical size K itself rather than with the number of bits needed to write K down.

This note proposes to settle the multi-rate case exactly and constructively. The plan is to say how hard multi-rate oldest-first scheduling is as a function of K. The main tool is a lesson from pseudo-polynomial scheduling theory: round the numbers into geometric buckets and pay for the rounding with a small amount of slack elsewhere. Here the slack is a one- or few-slot loosening of the delay threshold. The payoff is a scheduler that runs within LTE's 1 ms budget, and a delay guarantee in the same form as the unit-capacity one. The guarantee may carry an explicit penalty that depends on K.

Core Claim

The ingredient that makes oldest-first scheduling analyzable is that it is ordinal. Priority depends only on the order of packet ages, never on their numerical values. The first consequence is that age magnitudes never enter the running time, unlike age-weighted MaxWeight schedulers, whose objective sums ages. All numerical difficulty therefore sits in the capacities.

We define multi-rate oldest-first scheduling as follows. Sort all head-of-line packets by age and serve the longest possible prefix of that sorted list. Serving a prefix down to age threshold $\tau$ is feasible if channels can be given to users, at most one user per channel per slot, so that each user $i$ receives total capacity at least $d_i(\tau)$, the number of its packets older than $\tau$.

A reduction from Partition shows this is hard when capacities are large. Take two users, each with demand $S/2$, and channels whose capacities are the Partition numbers. So the per-slot problem is weakly NP-hard in K. The central hypothesis is that rounding capacities down to powers of two (or of $1+\epsilon$) makes each feasibility check polynomial in $n$ and $\log K$. The cost of that rounding can be absorbed as additive delay slack. Concretely, we conjecture a multi-rate analogue of the unit-capacity bound in Performance of Low-Complexity Greedy Scheduling Policies in Multi-Channel Wireless Networks. That paper shows that its greedy Delay-based Server-Side-Greedy (D-SSG) policy achieves, at delay threshold $b$, at least the delay-violation decay rate of the best policy at threshold $b-1$. Our analogue would replace $b-1$ with $b-g(K)$, where $g(K)$ is a constant or $O(\log K)$. The shift comes from the factor-two capacity loss per rounding level.

Research Program

The theoretical half has three parts.

Complexity in K. We will pin down the complexity of prefix feasibility as a function of K. Weak hardness follows from the Partition reduction when K grows with the input. It is open whether bounded K admits an exact algorithm that is exponential only in K. Such an algorithm would give a dynamic program over residual demands whose table size depends on K and $n$. This is the same kind of bottleneck Minimizing Age-of-Information with Throughput Requirements accepts in its expanded-network exact algorithm and flags as costly for large parameters. We aim to remove it rather than accept it.

Bucketed scheduler. We will build the scheduler. Capacities are grouped into dyadic classes, borrowing the geometric bucketing that A Polynomial Time Constant Approximation For Minimizing Total Weighted Flow-time uses to remove dependence on the processing-time ratio. That work handles single-machine weighted flow time and has no channels, interference, or queues. The volume binning of Improved Online Algorithm for Weighted Flow Time plays a similar role there. Within a class, capacities differ by at most a factor of two. That lets a greedy fill, or a small flow computation, decide feasibility up to the rounding loss. A binary search over the threshold $\tau$ then costs only $O(\log n)$ feasibility checks, because thresholds range over packet ranks rather than raw ages.

Delay analysis. We will extend the frame-based large-deviations argument from the D-SSG analysis to multi-rate ON-OFF-like channels whose states take values in $\{0,\dots,K\}$. The goal is to either prove the $b-g(K)$ bound or exhibit instances where no polynomial-time rule achieves any constant shift.

Delay-Based Back-Pressure Scheduling in Multihop Wireless Networks motivates why ordinal age is the right priority: its queue-based scheduler strands tail packets while the delay-based one does not. Low-Complexity Scheduling Policies for Achieving Throughput and Delay Optimality supplies the oldest-packets-first plus MaxWeight hybrid structure. We will reuse that structure to recover throughput optimality once delay behavior is settled. Both papers assume unit capacity, and that assumption is what we drop.

Baselines

The naive reference point is queue-length MaxWeight run with multi-rate capacities. It is throughput-optimal and needs no age tracking. Delay-Based Back-Pressure Scheduling in Multihop Wireless Networks reports that its multihop form lets tail-packet delay grow "linearly toward infinity" on the H-type topology. It should lose on tail delay, and we include it to show the regime matters.

The strongest competitor is the direct multi-rate extension of D-SSG. It goes channel by channel and gives each channel to the connected user whose oldest $c$ packets are oldest, where $c$ is that user's capacity on that channel. Its unit-capacity version runs in $2n^2+2n$ operations, measured at about 0.3 ms for 100 users and 100 channels. We found no reported result on Lacuna for its delay or throughput under multi-rate channels. We will implement it ourselves with the same traffic, channel traces, and CPU. Beating it means a measurably steeper decay of delay-violation probability, or a higher delay-constrained load, at equal or lower runtime within 1 ms.

The strongest optimization competitor is the pairwise LP relaxation MRR-LP(2) from Joint Scheduling and Resource Allocation for Packets with Deadlines and Priorities. It reports "up to a 25% performance gain" over Earliest Deadline First (EDF) at 8,000 packets/s, and "less than a 1.5% improvement" from its four-packet ILP. We will run it on its own urban-macro setup with deadlines converted to age thresholds, and report both its reward metric and our delay metrics. EDF is included as the classic rule.

Two ablations isolate the key ingredients. The first replaces dyadic rounding with the exact per-slot solver, an integer program usable at small $n$. This measures what rounding costs. The second replaces ordinal priority with age-weighted MaxWeight solved by the same exact solver. This tests whether ordinality, not optimization effort, drives the tail behavior. A final upper bound splits each channel into K unit sub-channels and runs unit-capacity D-SSG. This is infeasible under one-user-per-channel, but it shows the headroom.

Why not just…?

Why not just run D-SSG on multi-rate channels as is? This is the real threat. If the greedy's myopic capacity waste turns out to be rare on realistic fading, the practical case for a new scheduler collapses. The contribution would then be a proof that greedy suffices. The exact-solver ablation settles this directly: we measure the greedy's gap to the per-slot optimum on realistic traces and on adversarial Partition-style instances. If the gap is negligible on realistic traces, we redirect the theory to bounding greedy's $g(K)$ rather than promoting our scheduler.

Why not just split each channel into unit sub-channels? When a system lets several users share a channel in one slot, as with fine-grained resource blocks, the split is exact and the problem is easy. We state that boundary openly. Our model targets the one-user-per-channel-per-slot case, where the split is an infeasible relaxation, and we use it only as an upper bound.

Why not just solve a max-weight bipartite matching with weight equal to the summed ages of the top $c$ packets? That is polynomial, but only if each user receives at most one channel. With $n$ users and $n$ channels under ON-OFF-like fading, users routinely need several channels. We run the one-channel-per-user matching as a baseline to measure how much that restriction costs.

Why not just use MRR-LP(2)? It optimizes a deadline-reward objective, not oldest-first delay decay. Its $O(M^2 K^{2.5} L)$ cost is already flagged by its authors as heavy at scale. The runtime-versus-delay curve in our experiments decides whether it is competitive.

Proposed Experiments

Multi-channel downlink. We use the setting of the D-SSG paper, from 10 to 100 users with equal channel counts. ON-OFF channels are generalized to i.i.d. and correlated capacity levels in $\{0,\dots,K\}$ for K between 1 and 32. We measure the empirical probability that the largest head-of-line delay exceeds $b$, fit its decay rate in $n$ for each $b$, and compare the fitted rates across policies. The decisive check is whether the gap between our scheduler's decay rate at $b$ and the exact solver's at $b-g(K)$ stays non-negative as K grows. If it does, the conjectured bound holds. If our scheduler needs a shift that grows faster than $\log K$, the bucketing idea fails.

Urban macro cell. We use the Raviv–Leshem environment: 24 users, Rayleigh fading, and 4,000 to 8,000 packets/s. This tests realism and compares against MRR-LP(2) and EDF on their own metric.

Small multihop topologies. We use the H-type and 16-node grid topologies with multi-rate links. This confirms that the ordinal rule keeps tail delays bounded and preserves the throughput region.

Runtime. Runtime is reported against the 1 ms budget at every scale. It is also plotted against K to show empirically that the bucketed scheduler's cost grows with $\log K$ while the exact dynamic program's grows with K.