Hierarchical reinforcement learning splits control between a manager that proposes intermediate goals ("subgoals") and a worker that issues motor commands to reach them. The most reliable recent manager designs judge each subgoal by a hard test: if the worker does not reach it within a fixed number of steps, the subgoal is marked infeasible and the route through it is penalized. On real robots, commands often take effect late, and by a random amount. Sources include network lag, slow inference, and actuator stiction. Under such delays, the hard test starts lying. A perfectly reachable subgoal "fails" because half of its step budget was spent waiting for commands that had not yet executed. The manager then learns a map of the world that is wrong in a way that depends on the delay, and it reroutes around corridors that were fine.
We propose to fix this at the level of bookkeeping rather than by building a bigger worker. Every buffered command is tagged with the subgoal that issued it. Subgoal budgets are charged in executed commands rather than elapsed ticks. Attempts that run out of wall-clock time before running out of executed commands are treated as censored observations: we learned that the subgoal was not yet reached, not that it cannot be reached. Feasibility estimates for the manager's internal graph are then computed the way survival analysis handles incomplete follow-up. The claim is that this restores the reliability of strict subgoal checking under random-walk execution delays. It also does so more cheaply than the obvious fix of simply lengthening the timeout.
Core Claim
Strict Subgoal Execution (SSE) is our direct method source. SSE enforces "reach-it-or-fail" subgoals, sorts worker rollouts into success, stop-on-failure, and partial-progress classes through its frontier replay, and raises the cost of graph edges that keep failing. It reports near-100% success on AntDoubleKeyChest, where HIRO and HIGL score 0%. All of this assumes the environment pauses while decisions are made and commands execute instantly.
Our claim is twofold. First, under stochastic execution delay, SSE's failure labels become biased toward "infeasible" in proportion to the delay realized during the attempt. This bias, not worker motor quality, is the main reason hierarchical success collapses. Second, measuring subgoal time in executed commands and treating delay-truncated attempts as censored removes the bias without inflating the time wasted on subgoals that really are infeasible.
The second half separates our proposal from the naive fix. A longer fixed timeout also reduces false failures, but it pays for them with slower detection of true failures under every delay level. Our accounting adapts per attempt.
The idea borrows a principle from multi-agent path finding. Temporal plan graphs and their bidirectional extension (Bidirectional Temporal Plan Graph) stay safe under random robot delays because they bind actions to precedence and progress rather than to clock timestamps. BTPG-o improves median execution time by 8% to 20% over standard TPGs, with no collisions or deadlocks. We apply the same decoupling of progress from clock time to the manager's notion of whether a subgoal succeeded.
Research Program
The environment model is the stochastic execution-delay process formalized by Tree Search-Based Policy Optimization under Stochastic Execution Delay. In that model, each dispatched command takes effect after a delay $z_t \in [0, M]$ that follows a bounded random walk. We add one assumption: the platform acknowledges when each command actually executes. This is true of most motor controllers. We also run a variant where the acknowledgement is withheld and must be inferred.
The worker is not our contribution. It uses the action-buffer state of Addressing Signal Delay in Deep Reinforcement Learning, which pairs a delayed observation with the queue of pending commands and trains a delay-reconciled critic. We retain that paper's warning that its auxiliary state predictor degrades under unfixed delays, and we therefore omit the predictor. A forward-projection worker in the style of Delayed EfficientZero is an alternative, tested in one arm.
Three changes sit on top of SSE.
Subgoal tagging. Each queued command carries the identifier of the subgoal that issued it. When the manager switches subgoals while old commands are still in flight, rewards and outcomes are attributed to the subgoal whose commands actually executed. This extends Valensi et al.'s replay-buffer realignment, which credits the executing action rather than the dispatching timestamp, to the two-level case. It addresses the cross-level misalignment that the file identifies as unhandled by standard HRL.
Executed-step budgets. A subgoal fails only after the worker has had $K$ of its own commands executed without reaching it.
Censored edge estimates. An attempt that ends for another reason is recorded as censored rather than as a failure. Examples include an episode deadline or a manager preemption with fewer than $K$ executed commands. For an edge $e$ of the manager's graph, let $S_e$ be the number of successful attempts, $F_e$ the number of uncensored failures, and $C_e$ the number of censored attempts. The edge's feasibility estimate is
$$\hat p_e = \frac{S_e + \alpha}{S_e + F_e + \lambda\, C_e + \alpha + \beta},$$
where $\alpha, \beta$ are prior pseudo-counts and $\lambda \in [0,1]$ down-weights censored attempts. Setting $\lambda = 1$ recovers SSE's behavior of counting every timeout as a failure. Setting $\lambda = 0$ discards censored data, which is the standard unbiased choice when censoring is independent of feasibility. SSE's failure-aware path refinement then uses $-\log \hat p_e$ as the edge cost.
A small but important consequence concerns the manager's own input. Because outcome attribution is handled by tags, the manager does not need the primitive command queue. It conditions on the delayed observation, the identifiers and ages of in-flight subgoals, and the current delay. This is far smaller than the $M \times \dim(\mathcal{A})$ buffer that Valensi et al. show becomes intractable. The comparison is a measured result, not an assumption: the experiments include an arm that gives the manager the full queue.
The analysis has two parts. We will prove that, under a delay process independent of the subgoal's true feasibility, the $\lambda = 0$ estimator is consistent while the $\lambda = 1$ estimator is biased downward. The size of that bias grows with the probability that the delay exceeds the slack $T - K$, where $T$ is the wall-clock budget. We will then measure the bias directly. This requires an oracle feasibility label for each edge, obtained by rerunning the frozen worker from the same start with zero delay.
Baselines
Do-nothing reference. This is vanilla SSE with its published hyperparameters run under injected delay. It shows how much reliability strict checking loses when its zero-delay assumption breaks. No delayed numbers exist: no reported result found on Lacuna for SSE under execution delay. Its zero-delay figures, near-100% on AntDoubleKeyChest and 60% success on AntMazeBottleneck within 432 episodes, serve as the ceiling we try to recover.
Strongest hierarchical competitor. This is the naive composition: SSE with the Wang et al. delay-augmented worker and the timeout lengthened by the expected delay. We will tune it over a grid of timeout multipliers with the same tuning budget, seeds, environment steps, and network sizes as our method. It is the reviewer's default answer and the one most likely to match us.
Strongest flat competitor. This is Delayed EfficientZero from Tree Search-Based Policy Optimization under Stochastic Execution Delay. It outperformed baselines in 42 of 45 Atari 100k delay configurations and stayed effective at delays of 25 steps, while earlier methods struggled beyond 6. It has no reported result on long-horizon AntMaze tasks, so we will port it with matched compute. A second flat baseline is SAC with the Wang et al. augmentation. That paper reports it held up at 12-step delays where vanilla SAC scored near zero, while SAC and TD3 without augmentation fell by over 79% beyond four steps.
Ablations. Ablations isolate each ingredient: tagging off, executed-step budgets off (wall-clock budgets with tagging kept), and $\lambda \in \{0, 0.5, 1\}$. The $\lambda = 1$ arm with everything else on is the key ablation, because it isolates censoring as the cause of any gain.
What counts as beating a baseline. We beat the tuned long-timeout composition if we match or exceed its success rate at every delay level while reaching that success in fewer episodes on tasks with truly infeasible shortcuts. We beat the flat methods if we reach higher success on the long-horizon mazes at delays above six steps, with equal environment steps.
Why not just…?
Why not just lengthen SSE's timeout? This is a real threat, and it is why the tuned long-timeout composition is our main baseline. A timeout long enough to cover the worst-case delay spends that full duration on every truly infeasible subgoal. This is the conservativeness that interval-bounded planners such as Safe Multi-Agent Pathfinding with Time Uncertainty pay in throughput when delay intervals are wide. A timeout tuned to the mean still mislabels attempts in the tail. We will include mazes with deliberately infeasible shortcut edges so that the cost of slow failure detection shows up. If a single tuned multiplier matches us across all delay levels, including random-walk delays with large variance, then the censoring idea adds nothing, and we will report that.
Why not just use a flat delay-aware agent such as Delayed EfficientZero? Valensi et al. themselves note that its single-step tree search compounds model error over long horizons. Wang et al. report that predictive models degrade under random delay. The long-horizon mazes are precisely where flat methods without subgoals failed even at zero delay: SSE's baselines HIRO and HIGL got 0% on AntDoubleKeyChest, and flat methods are weaker still. The flat-baseline comparison settles this empirically.
Why not just give the manager the full action queue, or a recurrent memory, and let it learn? This is the brute-force augmentation that Valensi et al. show explodes when delays are stochastic and large. It also leaves the outcome labels in frontier replay biased, since no amount of manager memory changes which attempts were recorded as failures. The full-queue arm tests whether added input helps at all once labels are corrected. An LSTM-manager arm will be reported alongside, in the spirit of Handling Delay in Real-Time Reinforcement Learning, whose history-augmented networks outperformed LSTM baselines on MinAtar.
Proposed Experiments
The main testbed is the SSE long-horizon MuJoCo suite: AntMaze variants, AntMazeBottleneck, and AntDoubleKeyChest. Execution delay is injected in two forms. The constant form uses $M \in \{0, 4, 8, 12, 25\}$, a range chosen to span the 4-step failure point reported by Wang et al. and the 25-step range of Valensi et al. The stochastic form uses Valensi-style bounded random walks with the same maxima. We report success rate, episodes to 60% success, and the false-infeasibility rate of edges against the zero-delay oracle relabel. We also report wall-clock time spent on truly infeasible subgoals.
We add a two-delay setting in which manager inference has its own independent stochastic latency, to probe the cross-level misalignment that tagging targets. We also add a variant where execution acknowledgements are hidden and $z_t$ must be inferred from history. This tests whether the method survives when Valensi et al.'s observability assumption is dropped.
As a lower-priority transfer check, the identical accounting can be applied to edge feasibility in multi-agent path finding under random delays on the standard benchmark maps used by BTPG, with execution time compared against BTPG-o.
Two results would be decisive. The first is that false-infeasibility rates for $\lambda = 1$ rise with delay variance while $\lambda = 0$ stays flat. This confirms the mechanism. The second is that our method beats the best-tuned long-timeout composition under high-variance random-walk delays. This confirms the mechanism matters in practice. If the first holds and the second does not, the contribution reduces to a diagnosis, and the note will say so.
References
- Strict Subgoal Execution: Reliable Long-Horizon Planning in Hierarchical Reinforcement Learning
- Bidirectional Temporal Plan Graph: Enabling Switchable Passing Orders for More Efficient Multi-Agent Path Finding Plan Execution
- Tree Search-Based Policy Optimization under Stochastic Execution Delay
- Addressing Signal Delay in Deep Reinforcement Learning
- Safe Multi-Agent Pathfinding with Time Uncertainty
- Handling Delay in Real-Time Reinforcement Learning