Maze-Hard

10 papers · 18 extracted observations · maze solving · Markdown · CSV · JSON API

Comparable Cohort Timeline (proposed/measured methods; excludes quoted baselines & ablations)

Maze Solving: proposed/measured results on test (including papers where test split is standard/implicit).

77.383.088.694.320262027Attractor Models (27M parameters): 93.1 (2026)Controller with 8-bit finishing: 78.5 (2026)Standard (η=1.0): 78.8 (2026)Standard (η=1.0), P/S co-design SFT: 78.8 (2026)TAPS (P/S-Sign): 79.1 (2026)TAPS (P/S-Sign), P/S co-design SFT: 79.9 (2026)
Click any point on the timeline to inspect method, protocol, and paper.