# BBOB (`bbob`)

- **Canonical ID**: `bmk_95f2818891c6ab75`
- **Task**: black-box-optimization · **Modality**: unspecified
- **Coverage**: 27 papers · 85 observations
- **Tasks Evaluated**: Black Box Optimization (`?task=black-box-optimization`, 14 papers), Algorithm Performance Prediction (`?task=algorithm-performance-prediction`, 2 papers), Algorithm Selection (`?task=algorithm-selection`, 2 papers), Performance Prediction (`?task=performance-prediction`, 2 papers), Algorithm Configuration (`?task=algorithm-configuration`, 1 papers), Classification (`?task=classification`, 1 papers), Continuous Optimization (`?task=continuous-optimization`, 1 papers), Function Property Classification (`?task=function-property-classification`, 1 papers)

## Recent Extracted Observations

| Year | Method | Role | Metric | Score | Split | Regime | Paper | Verbatim Quote |
| --- | --- | --- | --- | ---: | --- | --- | --- | --- |
| 2019 | irace (integrated selection and configuration) | baseline | Average prediction error | 10.6% % | - | - | [Sequential vs. Integrated Algorithm Selection and Configuration: A Case Study for the Modular CMA-ES](/work/sequential-vs-integrated-algorithm-selection) | The bars in Figure~\ref{fig:results_full} seem to indicate that the prediction error for irace is smaller than the one for MIP-EGO. This is indeed the case: the |
| 2019 | MIP-EGO (integrated selection and configuration) | baseline | Average prediction error | 17.4% % | - | - | [Sequential vs. Integrated Algorithm Selection and Configuration: A Case Study for the Modular CMA-ES](/work/sequential-vs-integrated-algorithm-selection) | The bars in Figure~\ref{fig:results_full} seem to indicate that the prediction error for irace is smaller than the one for MIP-EGO. This is indeed the case: the |
